Industrial ventilation in the painting section
Air conditioning with temperature and humidity control in a building.
GENERAL COLLECTOR - MP03 Painting Line
Partial installation of a 700 m2 white room. View over the ceiling of the room. Control of temperature, humidity, pressures and particles.
Air conditioning, ventilation, dehumidification of the swimming pool and smoke control in case of fire.
Partial view of the hydraulic underfloor mounting.
Partial view of the hydraulic installation, with 4 tubes for transporting cold water and hot water.
Air conditioning, ventilation, smoke and pressurizations for smoke control.
Project and execution of work for the control of air pressures and renewals, for analysis to COVID-19.
Partial view of a ventilation system in the production area, with the contaminated air routed to an RTO.
Partial view of the air conditioning in a room, with hidden flap diffusers.
Punctual capture of particles and filtered through a unit with automatic cleaning filters by compressed air.
Partial view of the particle capture operation. Automatic cleaning of filters by compressed air.
Localized capture of dust and sent to a cartridge filter with automatic cleaning with compressed air.
Licensing / Execution project in the production area in the B15A building. Air conditioning, temperature, humidity, pressure and particle control.
Smoke-free parking and pressurization of stairwells
Partial view of the technical area of the air conditioning and ventilation systems at VASP headquarters.
Another partial view of the technical area of the air conditioning and ventilation systems at VASP headquarters.
Cooling systems with two-tube fancoils
Air conditioning systems type VRF
Air conditioning systems type VRF
HVAC licensing and execution projects.
Work completed and in operation.
Realization of licensing projects and execution of the building of clinical analyzes and complementary exams.
HVAC Project, Smoke Smoke, Smoke Control and Centralized Technical Management. It has an intelligent ventilation system that varies according to occupation.
Water / water heat pumps, which use the soil to dissipate thermal energy at constant temperature. Reaches COP 6. Perform the DHW heating and air conditioning of the hotel to 4 tubes.
Reinforcement of air conditioning with a Closecontrol unit in the Datacenter games santa casa
Adiabatic cooling near the furnace hot zone
Adiabatic cooling near the oven's hot zone.
1st company to install on the Portuguese market Chillers with Natural Organic Fluid R290 with Global Warming Potential 3
1st company to install Chillers with Natural Organic Fluid R290 on the market with Global Warming Potential 3.
Deactivation of the existing ditrite expansion system, without destabilizing the temperatures of this sensitive location.
Design / execution of air conditioning, smoke removal, smoke control and GTC of the 5-star hotel, with an indoor car park of 200 spaces.
Work in progress.
Air conditioning, smoke-free parking and smoke control in common areas.
Energy certification for use license.
Development of the project and execution of automation for the control of animal life.
Development of the project and execution of automation for the control of animal life.
Licensing project for all specialties. Issuance of energy pre-certificates, all rated A.
Installation of ventilation and air conditioning.
Realization of energy certificates with the letter A.
Temperature and humidity control in the VASP data center.
Reinforcement of the Novares factory thermal power plant in Leiria.
Ventilation and air conditioning in Hangars 4, 5 and 6.
Projects for Air Conditioning, Ventilation, Thermal, DHW Thermal Power Plant, Acoustics, Fire Safety, Storm and Wastewater, Gas.
Projects of Air Conditioning, Ventilation, Thermal, DHW Thermal Power Plant, Acoustics, Fire Safety, Rainwater and Wastewater, Gas, Electricity and Telecommunications.
Issuance of energy pre-certificates, all with class A.
Ventilation and air conditioning project. Ventilation, smoke and pressurization work.
Collective fans for the extraction of kitchen hoods, with pressure control for inverter at fan speeds according to needs.
Air conditioning of 2000 m2 with automatic control of ventilation by CO2. Simultaneous cooling and heating system.